Within this project, necessary changes to the hot water pipe were recorded. These changes were required to switch from steam to hot water. The modifications mainly included the dismantling of the existing steam and condensate pipe network and its replacement by a factory pre-isolated hot water pipe system, which was laid directly in the prepared construction pits.