The existing high pressure gas pipeline crossed a territory which is determined for building the Industrial Park in Nitra. The construction of the plant for the car manufacturer Jaguar and Land Rover would be affected in its extent by the existing gas pipeline. Therefore, STREICHER SK, a. s. was commissioned to relocate the 6 km high pressure gas pipeline DN 300. For the construction of the high pressure gas pipeline, high frequency welded pipes from steel grade L 290 (360) NE/ME-PSL2 were used. The scope of work of STREICHER SK a.s. comprised the dismantling of the former gas pipeline as well as the construction of the new gas pipeline.